By Tim Gilbert, P.E., LEED AP, CxA, Principal
HESM&A has provided commissioning services over the last 9
years for over 50 projects. We have completed and/or are currently working on
seventeen (17) LEED commissioning projects. As consulting and commissioning
engineers, HESM&A creates state-of-the-art building systems through careful
planning, application of our commissioning expertise, creative problem solving,
and detailed quality control. We are one of only a few consultants with
experience and expertise in building commissioning, in addition to our
engineering design capabilities, which makes us uniquely qualified for our role
as building commissioning agents.
Commissioning (Cx) is a systematic process for verifying that the installation
and functional operations of the energy consuming components of the MEPFP
building systems meet the owner’s requirements and the design’s intent.
Commissioning facilitates communication between the design team, owner, and
contractor. It is a proactive process that begins in the design phase with peer
review, continues through construction with submittal review, installation
verification, and maintenance accessibility clearances at equipment, and is
followed by acceptance testing of components and systems. Lastly, there is
training verification, warranty phase monitoring, and off-season testing. Our
goal is to empower the Owner’s maintenance staff with our commissioning process
so they can perform their own continuing or periodic commissioning to ensure
their facilities are operating at maximum energy efficiency.
Fundamental Commissioning Phases
§
Design Phase
§
Construction Phase
§
Acceptance Phase
§
Training Phase
Enhanced Commissioning Phases
§
Pre-Design Phase
§
Design Phase
§
Construction Phase
§
Warranty
Post-Acceptance Phase
Benefits of Commissioning
§
Facilitates
communication between design and construction teams
§
Acts as an
additional level of Quality Assurance/Quality Control
§
Reduction of Change
Orders
§
Fewer project delays
§
Managed start-up of
systems, increased quality of construction
§
Improved Indoor Air
Quality
§
Shorter turnover
transition between contractor and owner
§
Off-season HVAC
system operation testing to ensure less operating cost
§
Maintenance and
reliability of systems
§
Value-added quality
construction
§
Owner advocacy for
design and construction process
§
Construction process
documentation
Why HESM&A?
§
Certified
Communication Authorities (CxA) that are also PE’s and LEED AP’s
§
Unparalleled
technical expertise
§
Proven pro-active
communications skills for the ‘team goal” approach
§
Team approach with
positive attitude with design and construction teams for effective DAY ONE
building systems operation
§
Troubleshooting
ability due to field experience and PE design of systems
§
True VE ability
§
Value added to team
§
CxA Accreditation/
ACG and BCA Membership (national Cx organizations)
§
17 LEED Accredited
Professionals
§
9 years of active Cx
work and over 50 Completed Commissioning Projects
§
Current
Commissioning Projects:
|
·
|
|
·
|
|
·
Canopy Bluff
Hotel - LEED |
|
·
Los Angles, |
|
·
Clement Hall
at |
|
·
Emory Oxford
Residence Hall – LEED |
|
·
Dekalb Co., Georgia |
|
·
KSU
Multi-Purpose – LEED |
|
·
KSU Social
Science – LEED |
|
·
KSU Wilson
Bldg - LEED
|
|
·
|
|
·
Piedmont
Bathhouse - LEED |
|
·
Renaissance
200 - LEED |
|
·
St. Mary’s, |
|
·
UGA
Intellicenter
|
|
·
Westin Swan
Point Hotel – LEED |
|
·
|
|
·
|
|
·
|
|
·
Marriott
Gateway Hotel – LEED
|
|
·
Porter
Memorial Library – LEED
|